Report_Id:ESTIMATE FINAL updated 6-26-09

Date:04/08/2013

COMMONWEALTH OF KENTUCKY

TRANSPORTATION CABINET


Contract ID 091043 Estimate Number 0007 Estimate Type  FINAL
District Office PIKEVILLE (12360)  Wright, Doug, P.E.

Contractor DAVIS H ELLIOT COMPANY INC AND SUBSIDIARIES ADDR SN 0 VC Code VC0000080425
CONSTRUCTION INC
PO BOX 12108
LEXINGTON , KY , 40580
Pay Period 03/10/2012  TO  03/07/2013
Date Approved 04/04/2013
Primary Proj Number DE03600230943
Project No. FE04 036 0023 020-021, FE04 064 0003 015-016
Primary County LAWRENCE
Name of Road US23 AND KY3-KY3 AND KY2566
Description TRAFFIC SIGNAL RE-BUILD ON US23 AT KY3 AND KY3 AT KY2566 INTERSECTIONS
     
     
Date Let 06/12/2009 Formal Acceptance 07/19/2011
Date Awarded 06/22/2009 Date Work Began 08/10/2009
Date Contract Executed 07/13/2009 Open To Traffic 10/09/2009
Date NTP Issued 07/13/2009 Actual Completion Date 10/09/2009

Current Contract Amount

$112,180.65

Total to Date

Prev to Date

This Estimate

Original Amount

$111,030.00

Total Earnings

$110,632.50

$108,632.50

$2,000.00

Percent Complete

98.62

Stockpiled Materials

$0.00

$0.00

$0.00

Funds Available

$1,548.15

Gross Earnings

$110,632.50

$108,632.50

$2,000.00

Total Change Orders

$1,150.65

Other Adjustments

$0.00

$0.00

$0.00

TOTAL

$110,632.50

$108,632.50

$2,000.00

Contract Id 091043

Change Order Summary

County LAWRENCE
Estimate Nbr 0007 Project Number FE04 036 0023 020-021, FE04 064 0003 015-016
Contractor DAVIS H ELLIOT COMPANY INC AND SUBSIDIARIES Period 03/10/2012  TO  03/07/2013
 
 
CHANGE ORDERS HISTORY  
CHANGE ORDER NBR DESCRIPTION STATUS APPROVAL DATE TOTAL CO AMOUNT CONTRACT TIME ADJUSTED
001 overrun of Remove and Replace sidewalk Approved 01/17/2013 $1,150.65 0.0
 
 
 
 

CONTRACT ADJUSTMENTS HISTORY

Contract Adjustments

 

 

Adjustment Description

Est No

Adjustment Amount

Line Item Adjustments History
PROJECT ITEM NBR DESCRPITION TYPE EST NO

ADJ QUANTITY

UNIT PRICE

ADJUSTED AMOUNT

Contract Id 091043

COMMONWEALTH OF KENTUCKY

County LAWRENCE
Contract No

TRANSPORTATION CABINET

Primary Project Number DE03600230943
Estimate Nbr 0007 Period 03/10/2012  TO  03/07/2013
Contractor DAVIS H ELLIOT COMPANY INC AND SUBSIDIARIES
 
Project DE03600230943 Fed/State Project Number FE04 036 0023 020-021 Category 0001 SIGNALIZATION
LINE ITEM NUMBER ITEM DESCRIPTION ITEM NO. UNIT PLAN QTY CURRENT QUANTITY QUANTITY PAID THIS EST QUANTITY PAID PREV. EST QUANTITY PAID TO DATE UNIT PRICE AMOUNT PAID THIS EST AMOUNT PAID TO DATE
0010 SIGNS 02562 SQFT 165.75 165.750 0.000 0.000 0.10 0.00
0020 MAINTAIN & CONTROL TRAFFIC US 23 AND KY 3 02650 LS 1.00 1.000 1.000 1.000 1,500.00 1,500.00
0030 ARROW PANEL 02775 EACH 1.00 1.000 1.000 1.000 100.00 100.00
0040 CONDUIT-1 1/4 IN 04793 LF 1,656.00 1,656.000 2,014.000 2,014.000 4.00 8,056.00
0050 CONDUIT-2 IN 04795 LF 313.00 313.000 124.000 124.000 5.00 620.00
0060 JUNCTION BOX TYPE B 04811 EACH 11.00 11.000 12.000 12.000 500.00 6,000.00
0070 TRENCHING AND BACKFILLING 04820 LF 1,950.00 1,950.000 1,947.000 1,947.000 5.00 9,735.00
0080 LOOP WIRE 04830 LF 2,049.00 2,049.000 1,804.000 1,804.000 0.25 451.00
0090 CABLE-NO. 14/5C 04844 LF 5,356.00 5,356.000 4,143.000 4,143.000 0.50 2,071.50
0100 CABLE-NO. 14/7C 04845 LF 267.00 267.000 297.000 297.000 0.75 222.75
0110 CABLE-NO. 14/1 PAIR 04850 LF 1,537.00 1,537.000 1,960.000 1,960.000 0.50 980.00
0120 MESSENGER-10800 LB 04885 LF 565.00 565.000 840.000 840.000 5.00 4,200.00
0130 MESSENGER-15400 LB 04886 LF 140.00 140.000 195.000 195.000 6.00 1,170.00
0140 LOOP SAW SLOT AND FILL 04895 LF 811.00 811.000 502.000 502.000 8.00 4,016.00
0150 INSTALL CONTROLLER TYPE 170 04931 EACH 1.00 1.000 1.000 1.000 1,500.00 1,500.00
0160 INSTALL STEEL STRAIN POLE 04932 EACH 8.00 8.000 8.000 8.000 2,000.00 16,000.00
0170 REMOVE SIGNAL EQUIPMENT 04950 EACH 1.00 1.000 1.000 1.000 1,500.00 1,500.00
0180 TEMP RELOCATION OF SIGNAL HEAD 20094ES835 EACH 2.00 2.000 2.000 2.000 100.00 200.00
0190 INSTALL LED SIGNAL-3 SECTION 20188NS835 EACH 6.00 6.000 8.000 8.000 100.00 800.00
0200 INSTALL LED SIGNAL-5 SECTION 20189NS835 EACH 1.00 1.000 0.000 0.000 100.00 0.00
0210 INSTALL LED BEACON-12 IN 20408ES835 EACH 8.00 8.000 8.000 8.000 100.00 800.00
0220 ADVANCE BEACON CONTROL 23053NN EACH 2.00 2.000 2.000 2.000 3,500.00 7,000.00
0230 TRAFFIC SIGNAL POLE BASE 23157EN CUYD 34.28 34.280 33.390 33.390 300.00 10,017.00
Project DE03600230943 Fed/State Project Number FE04 036 0023 020-021 Category 0002 DEMOBILIZATION
0240 DEMOBILIZATION 02569 LS 1.00 1.000 1.000 0.000 1.000 1,374.56 1,374.56 1,374.56

SUBTOT

$1,374.56

$78,313.81

LNNBR STOCKPILE ADJUSTMENTS

UNIT

ADJ. QUANTITY

EST NBR

UNIT PRICE

ADJUSTED AMOUNT

SUBTOT

$0.00

 

 

 

Project DE06400030943 Fed/State Project Number FE04 064 0003 015-016 Category 0001 SIGNALIZATION
LINE ITEM NUMBER ITEM DESCRIPTION ITEM NO. UNIT PLAN QTY CURRENT QUANTITY QUANTITY PAID THIS EST QUANTITY PAID PREV. EST QUANTITY PAID TO DATE UNIT PRICE AMOUNT PAID THIS EST AMOUNT PAID TO DATE
0010 SIGNS 02562 SQFT 165.75 165.750 0.000 0.000 0.10 0.00
0020 MAINTAIN & CONTROL TRAFFIC KY 3 AND KY 2566 02650 LS 1.00 1.000 1.000 1.000 500.00 500.00
0030 ARROW PANEL 02775 EACH 1.00 1.000 0.000 0.000 100.00 0.00
0040 CONDUIT-1/2 IN 04790 LF 70.00 70.000 6.000 6.000 2.00 12.00
0050 CONDUIT-1 1/4 IN 04793 LF 109.00 109.000 93.500 93.500 4.00 374.00
0060 JUNCTION BOX TYPE B 04811 EACH 4.00 4.000 4.000 4.000 500.00 2,000.00
0070 TRENCHING AND BACKFILLING 04820 LF 109.00 109.000 93.500 93.500 5.00 467.50
0080 LOOP WIRE 04830 LF 1,496.00 1,496.000 1,475.000 1,475.000 0.25 368.75
0090 CABLE-NO. 14/5C 04844 LF 1,546.00 1,546.000 1,500.000 1,500.000 0.50 750.00
0100 MESSENGER-10800 LB 04885 LF 275.00 275.000 230.000 230.000 5.00 1,150.00
0110 LOOP SAW SLOT AND FILL 04895 LF 602.00 602.000 585.000 585.000 8.00 4,680.00
0120 PEDESTRIAN DETECTOR 04900 EACH 8.00 8.000 8.000 8.000 200.00 1,600.00
0130 INSTALL CONTROLLER TYPE 170 04931 EACH 1.00 1.000 1.000 1.000 1,500.00 1,500.00
0140 INSTALL STEEL STRAIN POLE 04932 EACH 4.00 4.000 4.000 4.000 2,000.00 8,000.00
0150 CABLE-NO. 14/1 PAIR 04850 LF 703.00 703.000 690.000 690.000 0.50 345.00
0160 REMOVE SIGNAL EQUIPMENT 04950 EACH 1.00 1.000 1.000 1.000 1,500.00 1,500.00
0170 REMOVE AND REPLACE SIDEWALK 04960 SQYD 10.00 15.110 15.110 15.110 30.00 453.30
0180 INSTALL PEDESTRIAN HEAD-LED 20093NS835 EACH 8.00 8.000 8.000 8.000 100.00 800.00
0190 TEMP RELOCATION OF SIGNAL HEAD 20094ES835 EACH 2.00 2.000 0.000 0.000 100.00 0.00
0200 INSTALL LED SIGNAL-3 SECTION 20188NS835 EACH 8.00 8.000 8.000 8.000 100.00 800.00
0210 TRAFFIC SIGNAL POLE BASE 23157EN CUYD 15.18 15.180 14.660 14.660 300.00 4,398.00
0220 INSTALL SIGNAL PEDESTAL 23222EC EACH 1.00 2.000 2.000 2.000 997.35 1,994.70
Project DE06400030943 Fed/State Project Number FE04 064 0003 015-016 Category 0002 DEMOBILIZATION
0230 DEMOBILIZATION 02569 LS 1.00 1.000 1.000 0.000 1.000 625.43 625.43 625.43

SUBTOT

$625.43

$110,632.50

LNNBR STOCKPILE ADJUSTMENTS

UNIT

ADJ. QUANTITY

EST NBR

UNIT PRICE

ADJUSTED AMOUNT

SUBTOT

$0.00